FOR FERROSIDER

WORTH THE DIFFERENCE.

ORI MARTIN OSPITALETTO
BRESCIA

Italy / WBF

Efficiency, flexibility, condensed time, reduced costs of installation and manual labor: thanks to the prefabrication technique, Forni Industriali Bendotti in just 5 months erected and started up the 110tph walking beam furnace for billets and slabs. A record time for the commissioni ng, less than twelve months after the order was signed. The furnace meets all the regulatory requirements in terms of CO2 emissions, respecting all the standards of the Italian Indu
str y 4.0 plan, thus guaranteeing the end customer access to the national 250 % Superamortization schedule.

 
 
 
 
 
 
 
 
 
 
 
 