New walking beam furnace 100T/h in Oman

New contract signed with the Sohar Steel company, in Oman, for a walking beam furnace 100T/H
The furnace will provide a production of 100 T/H with charging material section 120-140-150 mm billets. The billets can be loaded in single raw (12 mt).
The fuel is natural gas.

Author: bendotti

Bendotti