Erection

Prefabrication, applied to all the furnaces, permits exclusive advantages during the erection, such as completion in a very short time, with the relative reduction of costs of installation and of the necessary manual labour.

Furthermore risks of error are almost eliminated because all the parts are pre-erected and tested in our workshop, thus the construction takes place in total safety.

Thanks to the bendottiĀ method, a walking beam furnace of 120 t/h was erected in only 93 days.